Planning + Programming / Study 03

What does our next office actually need?

Translate people and work requirements into a quantified program and clear direction for a layout study.

Illustrative study · fictional scenario and sample data. This demonstrates a consulting approach. It is not a completed client engagement or an actual ITO result.

180People in the fictional organization
117Primary workpoints at 65% attendance
13,125Square feet: program + circulation model
01

The brief

Define the office before drawing it.

A fictional organization is considering its next office. Leadership needs to understand how many people to accommodate, which activities need dedicated space, and what usable-area allowance to explore before selecting a property.

The work starts with a planning brief that keeps headcount, primary workpoints, meeting seats, and area assumptions distinct.

The starting scenario

180 people × 65% design-day attendance = 117 attendees. Twelve attending people occupy private offices; the remaining 105 use shared open workpoints. Office occupants are included in the 117, not added afterward.

A deliberate constraint

The scenario has no primary-seat buffer. At 70% attendance, 126 attendees would create a nine-workpoint shortfall.

Executive readout

A quantified brief provides a starting point for the search and test fit.

The model contains 10,500 square feet of programmed spaces plus 2,625 square feet of internal circulation. The resulting 13,125-square-foot allowance needs reconciliation with a candidate property, the measurement method, and building-specific requirements.

02

The area model

Make every space allowance visible.

All room sizes and quantities are selected assumptions for this example. Unit areas include furniture and local working clearances. Internal circulation is added separately at 25% of the programmed subtotal, equivalent to 20% of the resulting total.

From work settings to a usable-area modelIllustrative allocation / square feet
Primary workpoints6,165
Focus + calls390
Meeting + project2,100
Community + arrival1,325
Support520
Internal circulation2,625
Program + internal circulation only. This is not a measured usable area, rentable-area requirement, or verified physical fit.
SpaceQuantityUnit area (sf)Subtotal (sf)
Shared open workpoints105454,725
Private offices121201,440
Single-person phone booths625150
Single-person focus rooms460240
Four-person meeting rooms2100200
Six-person meeting rooms4150600
Ten-person meeting rooms2240480
Sixteen-person meeting room1380380
Eight-person project rooms2220440
Kitchen / café1650650
Informal lounge1450450
Reception / waiting1225225
Print / local supply points270140
IT / equipment room18080
General storage1100100
Coat / personal storage1100100
Wellness room1100100
Programmed subtotal10,500
Internal circulation25% of subtotal2,625
Total modeled allowance13,125

Support settings do not add primary capacity.

The program contains 68 enclosed meeting seats and 16 project-room seats. People use these settings during the day, but those seats are not added to the 117 primary workpoints. Phone booths, focus rooms, and lounge seats are also excluded from primary capacity.

Building-core areas, partitions, columns, services, accessibility, and actual furniture would need resolution against a candidate property. No rentable-area conversion or construction cost is assumed.

03

From program to relationships

Give the test fit a clear direction.

Conceptual blocking relationshipsNot to scale. Blocks do not represent room dimensions or relative area.
Arrival + visitor meeting suiteKeep visitor routes legible
Shared café, lounge + circulationAccessible from all neighborhoods

Delivery

35Open workpoints

Product + design

30Open workpoints

Client partnerships

25Open workpoints

Corporate services

15Open workpoints
12 private offices + distributed focus and call settingsProtect quiet edges and confidential conversations
All adjacency priorities are hypotheses for a fictional organizational structure.
RelationshipPlanning direction
Delivery ↔ Product + designPlace their neighborhoods around shared project rooms to support work in progress.
Client partnerships ↔ ReceptionProvide direct access to the visitor meeting suite.
Corporate services ↔ Leadership officesSupport frequent coordination and enclosed discussions.
All neighborhoods ↔ Focus roomsDistribute quiet settings rather than placing them beside only one team.
Social hub ↔ Main circulationMake amenities easy to reach, with support spaces buffering noisy gathering areas from focus rooms.
04

The recommendation

Validate attendance before fixing the requirement.

Illustrative recommendation

Use the program as a testable brief, then compare alternatives.

Carry the 13,125-square-foot program-and-circulation model into an initial property review. Confirm attendance peaks, private-office occupancy, and sharing rules before treating 117 workpoints as the right capacity.

Request test-fit options that show the implications of the 65% and 70% attendance scenarios. Preserve the purpose of the meeting, focus, and support settings when comparing them. The model does not establish code compliance, a construction scope, or a leasing area.

  1. 01

    Agree on the capacity basis

    HR + business leaders

    Validate peak attendance, contractors, visitors, dedicated assignments, and whether a capacity reserve should be added.

  2. 02

    Confirm activities and adjacencies

    Team representatives + planning

    Review the room mix, confidentiality needs, and relationships that should shape the test fit.

  3. 03

    Test candidate properties

    Real estate + architect / design team

    Reconcile the program with measured space, core and service constraints, technical requirements, and actual layouts.

  4. 04

    Compare and approve the brief

    Facilities + finance + leadership

    Review capacity, setting quality, cost, and flexibility before selecting a property or approving design.

What the engagement could provide

A practical package for the next decision.

  • Planning brief and assumptions register
  • Quantified room and workpoint program
  • Attendance-capacity comparison
  • Adjacency priorities and conceptual blocking
  • Directions and acceptance questions for the test fit